![Combo copy-2 copy.jpg](https://static.wixstatic.com/media/c350b4_b139cf20b8a744c69b72ab099c864f55~mv2.jpg/v1/fill/w_95,h_71,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c350b4_b139cf20b8a744c69b72ab099c864f55~mv2.jpg)
Scotch College
Controltech Solutions were engaged in providing an all-inclusive service for Scotch College’s infrastructure upgrade.
PROJECT CHALLENGES
-
Strict 3-week timeframe
-
Ever-changing scope of work
-
Hardened rocky grounds
-
Saturated existing underground services.
PROJECT OUTCOME
-
We engaged our whole team to take care of all service locating, non-destructive digging, directional drilling, excavating, waste disposal, supply and installation of underground communications and electrical pits and conduits, and the breakout and reinstatement of existing surfaces (asphalting and concreting).
-
We eliminated the stress of dealing with multiple companies by handling all work internally, which allowed us to be flexible when necessary.
-
The site was restored to its original state before the school holidays ended, and our client was impressed with the results.
![scotch.jpg](https://static.wixstatic.com/media/c350b4_4c0dd4d1c1e84b8f9dc4deddbf25b373~mv2.jpg/v1/fill/w_123,h_102,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/c350b4_4c0dd4d1c1e84b8f9dc4deddbf25b373~mv2.jpg)